博亿国际

Home
About Us
Company Introduction
Enterprise Culture
Qualification and Honor
Management System
Legal Declaration
Contact Us
News
Solutions
Power Generation and Utilization
Power Transmission and Transformation
Power Distribution
DC Power Transmission and Power Electronics
Industry
Project Cases
Products
Supports
Language
Chinese
English

New Generation Smart Substation Operates Successfully

Release Time: 2016-01-06
Home > News > New Generation Smart Substation Operates Successfully

Zhejiang Qinfeng 220kV new generation smart substation, the New Generation Smart Substation Expansion Demonstration Project of State Grid Corporation of China, contracted by SIFANG, was operated successfully on November 29, 2015.

The whole substation, which is in a leading position in intelligentization, adopts the most advanced equipment including the advanced secondary equipment bay, substation protection and electronic transformer, etc. The substation introduces initially the project of PV building and microgrid integration to integrate the wind power, PV and energy storage battery.

The integrated microgrid system of generation, storage and consumption, within the scope of substation construction, is built by energy storage, PV power generation, architecture electric and substation power load to realize the integrated monitoring of renewable energy power generation and microgrid system and power distribution network and the integrated management of the substation power grid and the users side distribution power grid.The successful operation of Qinfeng substation realizes truly the integration of electric power, information and business.